Karamanlı Biogas Power Plant

Karamanlı
Biogas Power Plant, built and operated in Burdur Province, Karamanlı District ,
Karamanlı Village has an installed capacity of 9.360 MW e / 9.636 MW m . as per the generation
licence, numbered EÜ/ 10831 1/05139 . The purpose of the project activity is to produce
electricity from poultry and cattle manure with biomethanization process which will also result
in fermented products that could be utilized as fertilizers by local farmers. Karamanlı Biogas
Power plant h as been granted the generation license from EMRA on 10 03 2022 . As per the PO
expectations , the annual expected generation is 48,786.192 MWh/year.

Karamanlı Biogas Power Plant, built and operated in Burdur Province, Karamanlı District, Karamanlı Village has an installed capacity of 9.360MWe/ 9.636 MWm. as per the generation licence, numbered EÜ/10831-1/05139. The purpose of the project activity is to produce electricity from poultry and cattle manure with biomethanization process which will also result in fermented products that could be utilized as fertilizers by local farmers. Karamanlı Biogas Power plant has been granted the generation license from EMRA on 10-03-2022. As per the PO expectations, the annual expected generation is 48,786.192MWh/year.


The facility is expected to generate 48,786.192MWh/year when operational capacity is 9.36MWe. It is estimated that the project will help reduce carbon emissions by 86,665 tCO2e annually. The total emission reduction for the whole crediting period is calculated as 606,658tCO2e.


The project is expected to contribute 4 SDGs which are SDG 3, 7, 8 and 13.


 
 


akyel 1

Project Gallery

Gaia Climate

+90 212 224 04 50

info@gaiaclimate.com

Locations

Ooster Ringdijk 20, 1098TW Amsterdam

Maslak Mah. Maslak Meydan Sk. Beybi Giz Plaza A Blok No:1/99 Sarıyer/Istanbul 

Inquiries

For any inquiries, questions or commendations,

bottom of page